truck crane raises bridge | Munich, Germany
HTML-ΠΊΠΎΠ΄
- ΠΠΏΡΠ±Π»ΠΈΠΊΠΎΠ²Π°Π½ΠΎ: 22 Π΄Π΅ΠΊ 2023
- Film documentation of the bridge project of the building department of the state capital of Munich
Between the Munich district of Pasing and the
One of the largest restructuring areas extends into the city center
the state capital Munich.
The building department of the state capital
Munich built in the period from 2019 to the end
In 2023, one each south and north of the railway line
Foot and cycle path bridge, which is now a comfortable one
and enable safe crossing of Offenbachstrasse.
In addition, they ensure that the gap is closed
in the path parallel
Pedestrian and cycle path network
both sides of the tracks.
The bridge north of the railway line connects
the Pasinger center with the new development area
on Paul-Gerhardt-Allee with the district
Obermenzing and also closes a gap in
the new main cycle route, which will be along in the future
the railway systems from Munich Central Station
over a length of approx. 9 km to the west
runs to Pasing. The bridge was beginning
It will be collected in August 2023 and will be at the end of the year
Opened to traffic in 2023.
By clamping the steel superstructure into both
Abutment is created in the longitudinal direction of the bridge
an integral and robust frame construction,
which is support-free over a length of approx. 22 meters
spans Offenbachstrasse. The visual and
acoustic shielding against the railway systems
in the south there is an L-shaped cross-section
the bridge is guaranteed. There is a steel parapet for this
with a height of 2.70 meters.
The bridge has a usable width between
the railings of at least six meters.
Bridge North
Builder:
State capital Munich
Project management:
Civil Engineering Department
property planning/
Structural planning:
WTM Engineers
Bridge construction:
Mayerhofer high and low
Engineering GmbH,
Raffl Stahlbau GmbH
Ramps and stairs:
Mayerhofer high and low
Engineering GmbH
Length of bridge north:
22 meters
+++ Source: Verlagshaus Prinz-Carl GmbH - www.v-p-c.de
Customer:
State capital Munich - construction department
@baureferat.stadtmuenchen
Film documentation - drone footage (film and photo) - mobile time lapse from panTerra.
𧑠Become a channel member and receive exclusive benefits:
β‘ panterral.ink/join-this-channel
panTerra.tv - Find us here:
Website: www.panterra.tv
Instagram: / panterra.tv
Facebook: / panterra.tv
Twitter: / panterratv
email: socialmedia@panterra.tv
-
π¨πΌβπ» Join us! WE ARE LOOKING FOR YOU! (JOBS):
panterral.ink/jobs
π¬ Other projects:
panterral.ink/referenzen
βΉοΈ Further information about our time-lapse videos and online portals:
panterral.ink/Services
__________________________________________________
Copyright | Β© panTerra GmbH ΠΠΈΠ½ΠΎ